Bhavnagar-Botad Passenger Train No 59228

This article contains information about Bhavnagar-Botad Passenger train route, Bhavnagar-Botad Passenger train time table, Bhavnagar-Botad Passenger train schedule, Bhavnagar-Botad Passenger coach position, 59228 train route, 59228 train time table, 59228 train schedule, 59228 coach position, 59228 Stations, 59228 platform number, 59228 train platform. Also you will know train route from Bhavnagar to Botad, train schedule from Bhavnagar to Botad, train time table from Bhavnagar to Botad.

59228-bhavnagar-botad-passenger

Bhavnagar-Botad Passenger

Bhavnagar-Botad Passenger Train Number 59228 from Bhavnagar Terminus to Botad Junction is a Passenger train belonging to Indian Railways in WR/Western Zone. It has started services from NA. It has 10 halts. 14 intermediate Stations between Bhavnagar Terminus and Botad Junction Covering a total distance of 92 km in 2h 0m time. The Departure time of Bhavnagar-Botad Passenger from Bhavnagar Terminus is 05:00 and arrival time at Botad Junction is 07:00 . It usually comes on Platform Number 2 at Bhavnagar Terminus station and Platform Number 3 at Botad Junction.

Schedule of Bhavnagar-Botad Passenger

From: BVC Bhavnagar Terminus
To: BTD Botad Junction
Departs @ 05:00
Arrive @ 07:00
Platform 2
Platform 3
S
M
T
W
T
F
S
S
M
T
W
T
F
S
Type: Passenger
Zone:WR/Western
Travel Time: 2h 0m
10 halts
Distance: 92 km
Avg Speed: 46 km/hr
Peak Speed: NA
From: NA
To: NA

Train Route of Bhavnagar-Botad Passenger

#CodeStation NameArrivesDepartsPFHaltDay#KmSpeedElevZoneAddress
1BVC Bhavnagar Terminus 05:00210.02811mWRBhavnagar, Gujarat
2BVP Bhavnagar Para 05:0605:07--1m12.84817mWRBhavnagar, Gujarat
3VTJ Vartej 05:1605:17--1m19.94926mWRBhavnagar, Gujarat
4SOJN Sihor Junction 05:3005:31--1m120.55043mWRShihor, Gujarat
5SGD Songadh 05:4005:4111m128.06938mWRBhavnagar, Gujarat
6SOA Sanosra 05:5005:51--1m138.27435mWRState Highway 25, Gujarat
7DLJ Dhola Junction 06:0006:01--1m149.46237mWRDhola, Gujarat
8UJ Ujalvav 06:1106:12--1m159.75664mWRState Highway 31, Gujarat
9ALMR Alampur 06:1906:20--1m166.26759mWRState Highway 31, Gujarat
10NGA Ningala 06:2706:28--1m174.05456mWRState Highway 117, Gujarat
11LTD Lathidad 06:3606:37--1m181.22968mWRTajpar Rd, Gujarat
12BTD Botad Junction 07:003192.3-97mWRBotad, Gujarat

Alternate Trains of Bhavnagar-Botad Passenger

Train#Train NameSMTWTFS
12941Parasnath SF Express xxTxxxx
12972Bhavnagar - Mumbai Bandra Express SMTWTFS
Total Alternet Trains: 2

Return Train from Bhavnagar Terminus to Botad Junction

Train#Train NameSMTWTFS
12942Parasnath SF Express xxxxTxx
12971Mumbai Bandra Terminus - Bhavnagar SF Express SMTWTFS
Total Return Trains: 2

Coach Postion of Bhavnagar-Botad Passenger

Train From Bhavnagar to Botad

Bhavnagar-Botad Passenger Train Number 59228 runs in Bhavnagar to Botad Route. Above is the complete details about 59228 Arrival Departure Timing, Schedule, Route, Status and Time Table. Bhavnagar-Botad Passenger Stations, Bhavnagar-Botad Passenger platform number, Bhavnagar-Botad Passenger train platform, train route map, train route information, train route status, train route and time, train stops.