Bhavnagar Surendranagar Passenger Train No 59234

This article contains information about Bhavnagar Surendranagar Passenger train route, Bhavnagar Surendranagar Passenger train time table, Bhavnagar Surendranagar Passenger train schedule, Bhavnagar Surendranagar Passenger coach position, 59234 train route, 59234 train time table, 59234 train schedule, 59234 coach position, 59234 Stations, 59234 platform number, 59234 train platform. Also you will know train route from Bhavnagar to Surendranagar, train schedule from Bhavnagar to Surendranagar, train time table from Bhavnagar to Surendranagar.

59234-bhavnagar-surendranagar-passenger

Bhavnagar Surendranagar Passenger

Bhavnagar Surendranagar Passenger Train Number 59234 from Bhavnagar Terminus to Surendranagar Junction is a Passenger train belonging to Indian Railways in WR/Western Zone. It has started services from NA. It has 18 halts. 23 intermediate Stations between Bhavnagar Terminus and Surendranagar Junction Covering a total distance of 170 km in 3h 50m time. The Departure time of Bhavnagar Surendranagar Passenger from Bhavnagar Terminus is 14:25 and arrival time at Surendranagar Junction is 18:15 . It usually comes on Platform Number 1 at Bhavnagar Terminus station and Platform Number 4 at Surendranagar Junction.

Schedule of Bhavnagar Surendranagar Passenger

From: BVC Bhavnagar Terminus
To: SUNR Surendranagar Junction
Departs @ 14:25
Arrive @ 18:15
Platform 1
Platform 4
S
M
T
W
T
F
S
S
M
T
W
T
F
S
Type: Passenger
Zone:WR/Western
Travel Time: 3h 50m
18 halts
Distance: 170 km
Avg Speed: 44 km/hr
Peak Speed: NA
From: NA
To: NA

Train Route of Bhavnagar Surendranagar Passenger

#CodeStation NameArrivesDepartsPFHaltDay#KmSpeedElevZoneAddress
1BVC Bhavnagar Terminus 14:25110.02811mWRBhavnagar, Gujarat
2BVP Bhavnagar Para 14:3114:32--1m12.84317mWRBhavnagar, Gujarat
3VTJ Vartej 14:4214:43--1m19.94526mWRBhavnagar, Gujarat
4KDMR Khodiyar Mandir 14:5014:5111m115.24632mWRSH 21, Gujarat
5SOJN Sihor Junction 14:5814:59--1m120.55043mWRShihor, Gujarat
6SGD Songadh 15:0815:0911m128.06938mWRBhavnagar, Gujarat
7SOA Sanosra 15:1815:19--1m138.27435mWRState Highway 25, Gujarat
8DLJ Dhola Junction 15:2815:29--1m149.46237mWRDhola, Gujarat
9UJ Ujalvav 15:3915:40--1m159.75664mWRState Highway 31, Gujarat
10ALMR Alampur 15:4715:48--1m166.23959mWRState Highway 31, Gujarat
11NGA Ningala 16:0016:01--1m174.06256mWRState Highway 117, Gujarat
12LTD Lathidad 16:0816:09--1m181.26068mWRTajpar Rd, Gujarat
13BTD Botad Junction 16:2016:22--2m192.36797mWRBotad, Gujarat
14RUR Ranpur 16:4216:43--1m1114.56163mWRRanpur, Gujarat
15CDA Chuda 16:5917:00--1m1130.86063mWRState Highway 38, Gujarat
16LM Limbdi 17:1017:1111m1140.86150mWRLimbdi, Gujarat
17WC Wadhwan City 17:3117:32--1m1161.14370mWRSurendranagar, Gujarat
18JVN Jorawarnagar Junction 17:3717:3811m1164.73270mWRSurendra Nagar, Gujarat
19SRGT Surendranagar Gate 17:4317:4411m1167.4471mWRSurendranagar, Gujarat
20SUNR Surendranagar Junction 18:1541169.7-72mWRGujarat - 363001, Gujarat

Alternate Trains of Bhavnagar Surendranagar Passenger

Train#Train NameSMTWTFS
59207Bhavnagar Okha Passenger SMTWTFS
59230Bhavnagar-Dhrangadhra Passenger SMTWTFS
Total Alternet Trains: 2

Return Train from Bhavnagar Terminus to Surendranagar Junction

Train#Train NameSMTWTFS
59208Okha - Bhavnagar Passenger SMTWTFS
59229Dhrangadhra-Bhavnagar Passenger SMTWTFS
Total Return Trains: 2

Coach Postion of Bhavnagar Surendranagar Passenger

0
GEN

Train From Bhavnagar to Surendranagar

Bhavnagar Surendranagar Passenger Train Number 59234 runs in Bhavnagar to Surendranagar Route. Above is the complete details about 59234 Arrival Departure Timing, Schedule, Route, Status and Time Table. Bhavnagar Surendranagar Passenger Stations, Bhavnagar Surendranagar Passenger platform number, Bhavnagar Surendranagar Passenger train platform, train route map, train route information, train route status, train route and time, train stops.