Talgo Technical Trail Run (NDLS - BCT) 130 km hr Train No TALGO3-Slip

This article contains information about Talgo Technical Trail Run (NDLS - BCT) 130 km hr train route, Talgo Technical Trail Run (NDLS - BCT) 130 km hr train time table, Talgo Technical Trail Run (NDLS - BCT) 130 km hr train schedule, Talgo Technical Trail Run (NDLS - BCT) 130 km hr coach position, TALGO3-Slip train route, TALGO3-Slip train time table, TALGO3-Slip train schedule, TALGO3-Slip coach position, TALGO3-Slip Stations, TALGO3-Slip platform number, TALGO3-Slip train platform. Also you will know train route from New to Mumbai, train schedule from New to Mumbai, train time table from New to Mumbai.

TALGO3-Slip-talgo-technical-trail-run-ndls-bct-130-km-hr

Talgo Technical Trail Run (NDLS - BCT) 130 km hr

Talgo Technical Trail Run (NDLS - BCT) 130 km hr Train Number TALGO3-Slip from New Delhi to Mumbai Central is a other train belonging to Indian Railways in OTHER/other Zone. It has started services from NA. It has 5 halts. 227 intermediate Stations between New Delhi and Mumbai Central Covering a total distance of 1386 km in 12h 36m time. The Departure time of Talgo Technical Trail Run (NDLS - BCT) 130 km hr from New Delhi is 14:45 and arrival time at Mumbai Central is 03:21 +1 night. It usually comes on Platform Number -- at New Delhi station and Platform Number -- at Mumbai Central.

Schedule of Talgo Technical Trail Run (NDLS - BCT) 130 km hr

From: NDLS New Delhi
To: BCT Mumbai Central
Departs @ 14:45
Arrive @ 03:21 +1 night
Platform --
Platform --
S
M
T
W
T
F
S
S
M
T
W
T
F
S
Type: other
Zone:OTHER/other
Travel Time: 12h 36m
5 halts
Distance: 1386 km
Avg Speed: 110 km/hr
Peak Speed: NA
From: NA
To: NA

Train Route of Talgo Technical Trail Run (NDLS - BCT) 130 km hr

#CodeStation NameArrivesDepartsPFHaltDay#KmSpeedElevZoneAddress
1NDLS New Delhi 14:45--10.0119216mNRAjmeri Gate 110002, Delhi NCT
2KOTA Kota Junction 18:4018:45--5m1465.4117256mWCR324001, Rajasthan
3RTM Ratlam Junction 21:0221:05--3m1732.2104495mWR457001, Madhya Pradesh
4BRC Vadodara Junction 23:3523:45--10m1992.710737mWRVadodara 390005, Gujarat
5ST Surat 00:5801:03--5m21122.411818mWRSurat 395001, Gujarat
6BVI Borivali 03:0203:04--2m21355.910518mWRMumbai- 400066, Maharashtra
7BCT Mumbai Central 03:21--21385.6-8mWRMumbai 400008, Maharashtra

Alternate Trains of Talgo Technical Trail Run (NDLS - BCT) 130 km hr

Total Alternet Trains: 2

Return Train from New Delhi to Mumbai Central

Total Return Trains: 2

Coach Postion of Talgo Technical Trail Run (NDLS - BCT) 130 km hr

Train From New to Mumbai

Talgo Technical Trail Run (NDLS - BCT) 130 km hr Train Number TALGO3-Slip runs in New to Mumbai Route. Above is the complete details about TALGO3-Slip Arrival Departure Timing, Schedule, Route, Status and Time Table. Talgo Technical Trail Run (NDLS - BCT) 130 km hr Stations, Talgo Technical Trail Run (NDLS - BCT) 130 km hr platform number, Talgo Technical Trail Run (NDLS - BCT) 130 km hr train platform, train route map, train route information, train route status, train route and time, train stops.